Wednesday, August 21, 2013

Getting ready for "Opening Day"...
 Ms. Colby's Room
 Ms. Correia's Room
 Ms. Gallagher's Room
 Main Hallway
 Main Office
Main Office

Tuesday, August 13, 2013

Progress as of 8/13

sloped ceiling in main hall with sky light

cafeteria lighting



corridor ceiling

kitchen work

Wednesday, August 7, 2013

Updated 8/7

preparing bathrooms

The renovations are moving along!  Some classrooms are done, except for punch list items.  Materials and furniture are being moved back into those spaces.  The Main Office and Principal's Office at Bridge have returned to their regular spaces. 
begin installation of corridor fixtures and ceiling tiles

new lighting and ceiling tiles in the cafeteria

moving materials back in

preparing and painting cafeteria window wall system

Sunday, August 4, 2013

Updates 8/3/13


painting in the cafeteria
library ceiling
scrubbing and waxing classroom floors
painting a classroom at Bridge

Friday, July 26, 2013

Work 7/25/13

duct work in hall

a new paint color

masonry wall openings filled in the gym

a worker caulking the glass wall

Wednesday, July 24, 2013

Work from today 7/24/13

library ceiling

one of the roof top hair handling units (heating and cooling)

wall footing at new classroom, awaiting concrete

round duct work installed to provide further air circulation

Progress

ceiling soffit,  wall chase and new ceiling tile and lighting installation in classroom

main office window system installation

main corridor flooring installation

a classroom under construction with lights, paint and ceiling installed

Monday, July 22, 2013

The Work Continues

painter prepping and painting the library

new vinyl floor at Bridge

mason building block wall in a bathroom

flowable fill (concrete) poured for new classroom replacing the old boiler room

Monday, July 15, 2013

Summer Work in Progress

Demo is well underway and work is progressing.

The Old Boiler Room

Library Ceiling Work

Hallway Work

Thursday, May 9, 2013

New Windows


The classrooms in the fifth and third grade wing have started getting new windows at Bridge School. In only a few days the old windows have been removed and new windows were installed.

Interior of classroom getting new windows.



Exterior of classroom with temporary windows.


New windows in a grade 5 classroom!

New windows from the outside.

New Small Instructional Spaces and Offices

The mural has been removed to show the bright and beautiful glass front small instructional spaces and offices at Bridge. We are loving the new bright spaces!

Tuesday, April 23, 2013